< prev - next > Energy Mechanical Power KnO 100380_Aerial ropeways (Printable PDF)
Aerial ropeways of Nepal
Practical Action
Photo: Practical Action
The improved tuin was developed and tested at the village of Mahestar (about 60 km west of
Kathmandu). Based on the experience gained here, the design has been further developed
into a double-cable design. Although costing more it provides better balance and can carry a
greater load. Double-cable prototypes have been built in the villages of Kalleri, Pimaltar and
Balkhu, in Nepal’s Dhading district.
Photo: Practical Action
The costs involved in the construction of an improved tuin are:
labour
manufacturing
tuin support system (pillar construction)
wire cable
tuin trolley
pulley system
anchor block and other accessories
installation
equipment transportation